Work Breakdown with Tikz The 2019 Stack Overflow Developer Survey Results Are In Announcing the arrival of Valued Associate #679: Cesar Manara Planned maintenance scheduled April 17/18, 2019 at 00:00UTC (8:00pm US/Eastern)TikZ: Cropping the Bounding BoxTop-align text in a TikZ node of given size for single- and multiline caseDecorate path with just a colored thick lineWork breakdown structure (WBS) TikZHow to define the default vertical distance between nodes?TikZ scaling graphic and adjust node position and keep font sizetrapezium, how to calculate angles?Input/Output Nodes - Specification and Description LanguageAdjusting edge alignment and positioning of fitted nodetikz and pgfdeclareshape why the text is not at the center anchor?

Can a novice safely splice in wire to lengthen 5V charging cable?

Cooking pasta in a water boiler

system() function string length limit

How do I add random spotting to the same face in cycles?

Can undead you have reanimated wait inside a portable hole?

Is there a writing software that you can sort scenes like slides in PowerPoint?

What's the point in a preamp?

First use of “packing” as in carrying a gun

Does Parliament need to approve the new Brexit delay to 31 October 2019?

Why can't devices on different VLANs, but on the same subnet, communicate?

does high air pressure throw off wheel balance?

What was the last x86 CPU that did not have the x87 floating-point unit built in?

Simulation of a banking system with an Account class in C++

Can the DM override racial traits?

Can the prologue be the backstory of your main character?

Python - Fishing Simulator

Arduino Pro Micro - switch off LEDs

How to delete random line from file using Unix command?

Sort a list of pairs representing an acyclic, partial automorphism

University's motivation for having tenure-track positions

How are presidential pardons supposed to be used?

I could not break this equation. Please help me

Is every episode of "Where are my Pants?" identical?

How to split my screen on my Macbook Air?



Work Breakdown with Tikz



The 2019 Stack Overflow Developer Survey Results Are In
Announcing the arrival of Valued Associate #679: Cesar Manara
Planned maintenance scheduled April 17/18, 2019 at 00:00UTC (8:00pm US/Eastern)TikZ: Cropping the Bounding BoxTop-align text in a TikZ node of given size for single- and multiline caseDecorate path with just a colored thick lineWork breakdown structure (WBS) TikZHow to define the default vertical distance between nodes?TikZ scaling graphic and adjust node position and keep font sizetrapezium, how to calculate angles?Input/Output Nodes - Specification and Description LanguageAdjusting edge alignment and positioning of fitted nodetikz and pgfdeclareshape why the text is not at the center anchor?










4















Im trying to create a Work Breakdown structure with tikz. I would like to have Desired structure



Instead I have the following:Actual Outcome



Here's my code:



documentclass[tikz,border=10pt]standaloneusepackagetikz
usetikzlibraryshadows,arrows,positioning
usepackagecolor,soul %For highlighting
% Define the layers to draw the diagram
pgfdeclarelayerbackground
pgfdeclarelayerforeground
pgfsetlayersbackground,main,foreground

% Define block styles
tikzstylemateria=[draw, text width=6.0em, text centered,
minimum height=1.5em]
tikzstyleetape = [materia, text width=12em, minimum width=10em,
minimum height=3em, rounded corners]
tikzstyletexto = [above, text width=6em, text centered]
tikzstylelinepart = [draw, thick, color=black!30, -latex', dashed]
tikzstyleline = [draw, thick, color=black!30, -latex']
tikzstyleur=[draw, text centered, minimum height=0.01em]

% Define distances for bordering
newcommandblockdist1.3
newcommandedgedist1.5

newcommandetape[2]node (p#1) [etape]
#2

newcommandtransreceptor[3]%
path [linepart] (#1.east) -- node [above]
scriptsize #2 (#3);

begindocument
begintikzpicture[scale=0.7,transform shape]

% Draw diagram elements
path etape1textbfOperating Items;
path (p1.west)+(-5.0,0.0)etape2textbfNon-Operating Items;
path (p2.south)+(0.0,-1.0)etape3textbfInterest;
path (p3.south)+(0.0,-1.0)etape4textbfProfits and Losses;
path (p4.south)+(0.0,-1.0)etape5textbfSubsidies;
path (p1.south)+(2.5,-1.0)etape6textbfDirect Operating Costs;
path (p1.south)+(-2.5,-1.0)etape7textbfIndirect Operating Costs;




% Draw arrows between elements

path [line] (p2.south) -- node [above] (p3);
path [line] (p3.south) -- node [above] (p4);
path [line] (p4.south) -- node [above] (p5);
path [line] (p1.south) -- +(0.0,-0.2) -- +(+2.5,-0.2)
-- node [above, midway] (p6);
path [line] (p1.south) -- +(0.0,-0.2) -- +(-2.5,-0.2)
-- node [above, midway] (p7);





endtikzpicture
enddocument

´´´









share|improve this question







New contributor




L Lewis is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.
























    4















    Im trying to create a Work Breakdown structure with tikz. I would like to have Desired structure



    Instead I have the following:Actual Outcome



    Here's my code:



    documentclass[tikz,border=10pt]standaloneusepackagetikz
    usetikzlibraryshadows,arrows,positioning
    usepackagecolor,soul %For highlighting
    % Define the layers to draw the diagram
    pgfdeclarelayerbackground
    pgfdeclarelayerforeground
    pgfsetlayersbackground,main,foreground

    % Define block styles
    tikzstylemateria=[draw, text width=6.0em, text centered,
    minimum height=1.5em]
    tikzstyleetape = [materia, text width=12em, minimum width=10em,
    minimum height=3em, rounded corners]
    tikzstyletexto = [above, text width=6em, text centered]
    tikzstylelinepart = [draw, thick, color=black!30, -latex', dashed]
    tikzstyleline = [draw, thick, color=black!30, -latex']
    tikzstyleur=[draw, text centered, minimum height=0.01em]

    % Define distances for bordering
    newcommandblockdist1.3
    newcommandedgedist1.5

    newcommandetape[2]node (p#1) [etape]
    #2

    newcommandtransreceptor[3]%
    path [linepart] (#1.east) -- node [above]
    scriptsize #2 (#3);

    begindocument
    begintikzpicture[scale=0.7,transform shape]

    % Draw diagram elements
    path etape1textbfOperating Items;
    path (p1.west)+(-5.0,0.0)etape2textbfNon-Operating Items;
    path (p2.south)+(0.0,-1.0)etape3textbfInterest;
    path (p3.south)+(0.0,-1.0)etape4textbfProfits and Losses;
    path (p4.south)+(0.0,-1.0)etape5textbfSubsidies;
    path (p1.south)+(2.5,-1.0)etape6textbfDirect Operating Costs;
    path (p1.south)+(-2.5,-1.0)etape7textbfIndirect Operating Costs;




    % Draw arrows between elements

    path [line] (p2.south) -- node [above] (p3);
    path [line] (p3.south) -- node [above] (p4);
    path [line] (p4.south) -- node [above] (p5);
    path [line] (p1.south) -- +(0.0,-0.2) -- +(+2.5,-0.2)
    -- node [above, midway] (p6);
    path [line] (p1.south) -- +(0.0,-0.2) -- +(-2.5,-0.2)
    -- node [above, midway] (p7);





    endtikzpicture
    enddocument

    ´´´









    share|improve this question







    New contributor




    L Lewis is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
    Check out our Code of Conduct.






















      4












      4








      4








      Im trying to create a Work Breakdown structure with tikz. I would like to have Desired structure



      Instead I have the following:Actual Outcome



      Here's my code:



      documentclass[tikz,border=10pt]standaloneusepackagetikz
      usetikzlibraryshadows,arrows,positioning
      usepackagecolor,soul %For highlighting
      % Define the layers to draw the diagram
      pgfdeclarelayerbackground
      pgfdeclarelayerforeground
      pgfsetlayersbackground,main,foreground

      % Define block styles
      tikzstylemateria=[draw, text width=6.0em, text centered,
      minimum height=1.5em]
      tikzstyleetape = [materia, text width=12em, minimum width=10em,
      minimum height=3em, rounded corners]
      tikzstyletexto = [above, text width=6em, text centered]
      tikzstylelinepart = [draw, thick, color=black!30, -latex', dashed]
      tikzstyleline = [draw, thick, color=black!30, -latex']
      tikzstyleur=[draw, text centered, minimum height=0.01em]

      % Define distances for bordering
      newcommandblockdist1.3
      newcommandedgedist1.5

      newcommandetape[2]node (p#1) [etape]
      #2

      newcommandtransreceptor[3]%
      path [linepart] (#1.east) -- node [above]
      scriptsize #2 (#3);

      begindocument
      begintikzpicture[scale=0.7,transform shape]

      % Draw diagram elements
      path etape1textbfOperating Items;
      path (p1.west)+(-5.0,0.0)etape2textbfNon-Operating Items;
      path (p2.south)+(0.0,-1.0)etape3textbfInterest;
      path (p3.south)+(0.0,-1.0)etape4textbfProfits and Losses;
      path (p4.south)+(0.0,-1.0)etape5textbfSubsidies;
      path (p1.south)+(2.5,-1.0)etape6textbfDirect Operating Costs;
      path (p1.south)+(-2.5,-1.0)etape7textbfIndirect Operating Costs;




      % Draw arrows between elements

      path [line] (p2.south) -- node [above] (p3);
      path [line] (p3.south) -- node [above] (p4);
      path [line] (p4.south) -- node [above] (p5);
      path [line] (p1.south) -- +(0.0,-0.2) -- +(+2.5,-0.2)
      -- node [above, midway] (p6);
      path [line] (p1.south) -- +(0.0,-0.2) -- +(-2.5,-0.2)
      -- node [above, midway] (p7);





      endtikzpicture
      enddocument

      ´´´









      share|improve this question







      New contributor




      L Lewis is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
      Check out our Code of Conduct.












      Im trying to create a Work Breakdown structure with tikz. I would like to have Desired structure



      Instead I have the following:Actual Outcome



      Here's my code:



      documentclass[tikz,border=10pt]standaloneusepackagetikz
      usetikzlibraryshadows,arrows,positioning
      usepackagecolor,soul %For highlighting
      % Define the layers to draw the diagram
      pgfdeclarelayerbackground
      pgfdeclarelayerforeground
      pgfsetlayersbackground,main,foreground

      % Define block styles
      tikzstylemateria=[draw, text width=6.0em, text centered,
      minimum height=1.5em]
      tikzstyleetape = [materia, text width=12em, minimum width=10em,
      minimum height=3em, rounded corners]
      tikzstyletexto = [above, text width=6em, text centered]
      tikzstylelinepart = [draw, thick, color=black!30, -latex', dashed]
      tikzstyleline = [draw, thick, color=black!30, -latex']
      tikzstyleur=[draw, text centered, minimum height=0.01em]

      % Define distances for bordering
      newcommandblockdist1.3
      newcommandedgedist1.5

      newcommandetape[2]node (p#1) [etape]
      #2

      newcommandtransreceptor[3]%
      path [linepart] (#1.east) -- node [above]
      scriptsize #2 (#3);

      begindocument
      begintikzpicture[scale=0.7,transform shape]

      % Draw diagram elements
      path etape1textbfOperating Items;
      path (p1.west)+(-5.0,0.0)etape2textbfNon-Operating Items;
      path (p2.south)+(0.0,-1.0)etape3textbfInterest;
      path (p3.south)+(0.0,-1.0)etape4textbfProfits and Losses;
      path (p4.south)+(0.0,-1.0)etape5textbfSubsidies;
      path (p1.south)+(2.5,-1.0)etape6textbfDirect Operating Costs;
      path (p1.south)+(-2.5,-1.0)etape7textbfIndirect Operating Costs;




      % Draw arrows between elements

      path [line] (p2.south) -- node [above] (p3);
      path [line] (p3.south) -- node [above] (p4);
      path [line] (p4.south) -- node [above] (p5);
      path [line] (p1.south) -- +(0.0,-0.2) -- +(+2.5,-0.2)
      -- node [above, midway] (p6);
      path [line] (p1.south) -- +(0.0,-0.2) -- +(-2.5,-0.2)
      -- node [above, midway] (p7);





      endtikzpicture
      enddocument

      ´´´






      tikz-pgf tikz-trees






      share|improve this question







      New contributor




      L Lewis is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
      Check out our Code of Conduct.











      share|improve this question







      New contributor




      L Lewis is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
      Check out our Code of Conduct.









      share|improve this question




      share|improve this question






      New contributor




      L Lewis is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
      Check out our Code of Conduct.









      asked Apr 7 at 18:12









      L LewisL Lewis

      232




      232




      New contributor




      L Lewis is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
      Check out our Code of Conduct.





      New contributor





      L Lewis is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
      Check out our Code of Conduct.






      L Lewis is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
      Check out our Code of Conduct.




















          1 Answer
          1






          active

          oldest

          votes


















          5














          Welcome to TeX-SE! If your question is about a minimal damage modification of your code that produces something of that sort, here is a proposal:



          documentclass[tikz,border=10pt]standalone
          usetikzlibraryshadows,arrows,positioning
          usepackagecolor,soul %For highlighting
          % Define the layers to draw the diagram
          pgfdeclarelayerbackground
          pgfdeclarelayerforeground
          pgfsetlayersbackground,main,foreground

          % Define block styles
          tikzsetmateria/.style=draw, text width=6.0em, text centered,
          minimum height=1.5em,
          etape/.style=materia, text width=12em, minimum width=10em,
          minimum height=3em, rounded corners,
          texto/.style=above, text width=6em, text centered,
          linepart/.style=draw, thick, color=black!30, -latex', dashed,
          line/.style=draw, thick, color=black!30, -latex',
          ur/.style=draw, text centered, minimum height=0.01em

          % Define distances for bordering
          newcommandblockdist1.3
          newcommandedgedist1.5

          newcommandetape[2]node (p#1) [etape]
          #2

          newcommandtransreceptor[3]%
          path [linepart] (#1.east) -- node [above]
          scriptsize #2 (#3);

          begindocument
          begintikzpicture[scale=0.7,transform shape]

          % Draw diagram elements
          path etape1textbfOperating Items;
          path (p1.west)+(-6.5,0.0)etape2textbfNon-Operating Items;
          path (p2.south)+(1,-1.0)etape3textbfInterest;
          path (p3.south)+(0.0,-1.0)etape4textbfProfits and Losses;
          path (p4.south)+(0.0,-1.0)etape5textbfSubsidies;
          path (p1.south)+(2.5,-1.0)etape6textbfDirect Operating Costs;
          path (p1.south)+(-2.5,-1.0)etape7textbfIndirect Operating Costs;




          % Draw arrows between elements
          foreach X in 3,4,5
          - (pX.west);
          path [line] (p1.south) -- +(0.0,-0.2) -- +(+2.5,-0.2)
          -- node [above, midway] (p6);
          path [line] (p1.south) -- +(0.0,-0.2) -- +(-2.5,-0.2)
          -- node [above, midway] (p7);


          endtikzpicture
          enddocument


          enter image description here



          If you are asking about a cleaner code that achieves this output, the answer will be quite different. E.g. the following is already shorter and simpler IMHO.



          documentclass[tikz,border=10pt]standalone
          usetikzlibraryarrows,positioning

          % Define block styles
          tikzsetmateria/.style=draw, text width=6.0em, text centered,
          minimum height=1.5em,
          etape/.style=materia, text width=12em, minimum width=10em,
          minimum height=3em, rounded corners,
          line/.style=draw, thick, color=black!30, -latex'


          begindocument
          begintikzpicture[scale=0.7,transform shape]
          beginscope[nodes=etape,font=bfseries]
          node (p1) Operating Items;
          node[left=6.5cm of p1] (p2) Non-Operating Items;
          node[below=5mm of p2,xshift=8mm] (p3) Interest;
          node[below=5mm of p3] (p4) Profits and Losses;
          node[below=5mm of p4] (p5) Subsidies;
          node[below left=8mm and 1mm of p1.south] (p6) Direct Operating Costs;
          node[below right=8mm and 1mm of p1.south] (p7) Indirect Operating Costs;
          endscope
          % Draw arrows between elements
          foreach X in 3,4,5
          - (pX.west);
          foreach X in 6,7
          path [line] (p1.south) -- ++(0,-2mm) -
          endtikzpicture
          enddocument





          share|improve this answer

























          • That was exactly what I was searching for

            – L Lewis
            Apr 7 at 18:36











          Your Answer








          StackExchange.ready(function()
          var channelOptions =
          tags: "".split(" "),
          id: "85"
          ;
          initTagRenderer("".split(" "), "".split(" "), channelOptions);

          StackExchange.using("externalEditor", function()
          // Have to fire editor after snippets, if snippets enabled
          if (StackExchange.settings.snippets.snippetsEnabled)
          StackExchange.using("snippets", function()
          createEditor();
          );

          else
          createEditor();

          );

          function createEditor()
          StackExchange.prepareEditor(
          heartbeatType: 'answer',
          autoActivateHeartbeat: false,
          convertImagesToLinks: false,
          noModals: true,
          showLowRepImageUploadWarning: true,
          reputationToPostImages: null,
          bindNavPrevention: true,
          postfix: "",
          imageUploader:
          brandingHtml: "Powered by u003ca class="icon-imgur-white" href="https://imgur.com/"u003eu003c/au003e",
          contentPolicyHtml: "User contributions licensed under u003ca href="https://creativecommons.org/licenses/by-sa/3.0/"u003ecc by-sa 3.0 with attribution requiredu003c/au003e u003ca href="https://stackoverflow.com/legal/content-policy"u003e(content policy)u003c/au003e",
          allowUrls: true
          ,
          onDemand: true,
          discardSelector: ".discard-answer"
          ,immediatelyShowMarkdownHelp:true
          );



          );






          L Lewis is a new contributor. Be nice, and check out our Code of Conduct.









          draft saved

          draft discarded


















          StackExchange.ready(
          function ()
          StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2ftex.stackexchange.com%2fquestions%2f483701%2fwork-breakdown-with-tikz%23new-answer', 'question_page');

          );

          Post as a guest















          Required, but never shown

























          1 Answer
          1






          active

          oldest

          votes








          1 Answer
          1






          active

          oldest

          votes









          active

          oldest

          votes






          active

          oldest

          votes









          5














          Welcome to TeX-SE! If your question is about a minimal damage modification of your code that produces something of that sort, here is a proposal:



          documentclass[tikz,border=10pt]standalone
          usetikzlibraryshadows,arrows,positioning
          usepackagecolor,soul %For highlighting
          % Define the layers to draw the diagram
          pgfdeclarelayerbackground
          pgfdeclarelayerforeground
          pgfsetlayersbackground,main,foreground

          % Define block styles
          tikzsetmateria/.style=draw, text width=6.0em, text centered,
          minimum height=1.5em,
          etape/.style=materia, text width=12em, minimum width=10em,
          minimum height=3em, rounded corners,
          texto/.style=above, text width=6em, text centered,
          linepart/.style=draw, thick, color=black!30, -latex', dashed,
          line/.style=draw, thick, color=black!30, -latex',
          ur/.style=draw, text centered, minimum height=0.01em

          % Define distances for bordering
          newcommandblockdist1.3
          newcommandedgedist1.5

          newcommandetape[2]node (p#1) [etape]
          #2

          newcommandtransreceptor[3]%
          path [linepart] (#1.east) -- node [above]
          scriptsize #2 (#3);

          begindocument
          begintikzpicture[scale=0.7,transform shape]

          % Draw diagram elements
          path etape1textbfOperating Items;
          path (p1.west)+(-6.5,0.0)etape2textbfNon-Operating Items;
          path (p2.south)+(1,-1.0)etape3textbfInterest;
          path (p3.south)+(0.0,-1.0)etape4textbfProfits and Losses;
          path (p4.south)+(0.0,-1.0)etape5textbfSubsidies;
          path (p1.south)+(2.5,-1.0)etape6textbfDirect Operating Costs;
          path (p1.south)+(-2.5,-1.0)etape7textbfIndirect Operating Costs;




          % Draw arrows between elements
          foreach X in 3,4,5
          - (pX.west);
          path [line] (p1.south) -- +(0.0,-0.2) -- +(+2.5,-0.2)
          -- node [above, midway] (p6);
          path [line] (p1.south) -- +(0.0,-0.2) -- +(-2.5,-0.2)
          -- node [above, midway] (p7);


          endtikzpicture
          enddocument


          enter image description here



          If you are asking about a cleaner code that achieves this output, the answer will be quite different. E.g. the following is already shorter and simpler IMHO.



          documentclass[tikz,border=10pt]standalone
          usetikzlibraryarrows,positioning

          % Define block styles
          tikzsetmateria/.style=draw, text width=6.0em, text centered,
          minimum height=1.5em,
          etape/.style=materia, text width=12em, minimum width=10em,
          minimum height=3em, rounded corners,
          line/.style=draw, thick, color=black!30, -latex'


          begindocument
          begintikzpicture[scale=0.7,transform shape]
          beginscope[nodes=etape,font=bfseries]
          node (p1) Operating Items;
          node[left=6.5cm of p1] (p2) Non-Operating Items;
          node[below=5mm of p2,xshift=8mm] (p3) Interest;
          node[below=5mm of p3] (p4) Profits and Losses;
          node[below=5mm of p4] (p5) Subsidies;
          node[below left=8mm and 1mm of p1.south] (p6) Direct Operating Costs;
          node[below right=8mm and 1mm of p1.south] (p7) Indirect Operating Costs;
          endscope
          % Draw arrows between elements
          foreach X in 3,4,5
          - (pX.west);
          foreach X in 6,7
          path [line] (p1.south) -- ++(0,-2mm) -
          endtikzpicture
          enddocument





          share|improve this answer

























          • That was exactly what I was searching for

            – L Lewis
            Apr 7 at 18:36















          5














          Welcome to TeX-SE! If your question is about a minimal damage modification of your code that produces something of that sort, here is a proposal:



          documentclass[tikz,border=10pt]standalone
          usetikzlibraryshadows,arrows,positioning
          usepackagecolor,soul %For highlighting
          % Define the layers to draw the diagram
          pgfdeclarelayerbackground
          pgfdeclarelayerforeground
          pgfsetlayersbackground,main,foreground

          % Define block styles
          tikzsetmateria/.style=draw, text width=6.0em, text centered,
          minimum height=1.5em,
          etape/.style=materia, text width=12em, minimum width=10em,
          minimum height=3em, rounded corners,
          texto/.style=above, text width=6em, text centered,
          linepart/.style=draw, thick, color=black!30, -latex', dashed,
          line/.style=draw, thick, color=black!30, -latex',
          ur/.style=draw, text centered, minimum height=0.01em

          % Define distances for bordering
          newcommandblockdist1.3
          newcommandedgedist1.5

          newcommandetape[2]node (p#1) [etape]
          #2

          newcommandtransreceptor[3]%
          path [linepart] (#1.east) -- node [above]
          scriptsize #2 (#3);

          begindocument
          begintikzpicture[scale=0.7,transform shape]

          % Draw diagram elements
          path etape1textbfOperating Items;
          path (p1.west)+(-6.5,0.0)etape2textbfNon-Operating Items;
          path (p2.south)+(1,-1.0)etape3textbfInterest;
          path (p3.south)+(0.0,-1.0)etape4textbfProfits and Losses;
          path (p4.south)+(0.0,-1.0)etape5textbfSubsidies;
          path (p1.south)+(2.5,-1.0)etape6textbfDirect Operating Costs;
          path (p1.south)+(-2.5,-1.0)etape7textbfIndirect Operating Costs;




          % Draw arrows between elements
          foreach X in 3,4,5
          - (pX.west);
          path [line] (p1.south) -- +(0.0,-0.2) -- +(+2.5,-0.2)
          -- node [above, midway] (p6);
          path [line] (p1.south) -- +(0.0,-0.2) -- +(-2.5,-0.2)
          -- node [above, midway] (p7);


          endtikzpicture
          enddocument


          enter image description here



          If you are asking about a cleaner code that achieves this output, the answer will be quite different. E.g. the following is already shorter and simpler IMHO.



          documentclass[tikz,border=10pt]standalone
          usetikzlibraryarrows,positioning

          % Define block styles
          tikzsetmateria/.style=draw, text width=6.0em, text centered,
          minimum height=1.5em,
          etape/.style=materia, text width=12em, minimum width=10em,
          minimum height=3em, rounded corners,
          line/.style=draw, thick, color=black!30, -latex'


          begindocument
          begintikzpicture[scale=0.7,transform shape]
          beginscope[nodes=etape,font=bfseries]
          node (p1) Operating Items;
          node[left=6.5cm of p1] (p2) Non-Operating Items;
          node[below=5mm of p2,xshift=8mm] (p3) Interest;
          node[below=5mm of p3] (p4) Profits and Losses;
          node[below=5mm of p4] (p5) Subsidies;
          node[below left=8mm and 1mm of p1.south] (p6) Direct Operating Costs;
          node[below right=8mm and 1mm of p1.south] (p7) Indirect Operating Costs;
          endscope
          % Draw arrows between elements
          foreach X in 3,4,5
          - (pX.west);
          foreach X in 6,7
          path [line] (p1.south) -- ++(0,-2mm) -
          endtikzpicture
          enddocument





          share|improve this answer

























          • That was exactly what I was searching for

            – L Lewis
            Apr 7 at 18:36













          5












          5








          5







          Welcome to TeX-SE! If your question is about a minimal damage modification of your code that produces something of that sort, here is a proposal:



          documentclass[tikz,border=10pt]standalone
          usetikzlibraryshadows,arrows,positioning
          usepackagecolor,soul %For highlighting
          % Define the layers to draw the diagram
          pgfdeclarelayerbackground
          pgfdeclarelayerforeground
          pgfsetlayersbackground,main,foreground

          % Define block styles
          tikzsetmateria/.style=draw, text width=6.0em, text centered,
          minimum height=1.5em,
          etape/.style=materia, text width=12em, minimum width=10em,
          minimum height=3em, rounded corners,
          texto/.style=above, text width=6em, text centered,
          linepart/.style=draw, thick, color=black!30, -latex', dashed,
          line/.style=draw, thick, color=black!30, -latex',
          ur/.style=draw, text centered, minimum height=0.01em

          % Define distances for bordering
          newcommandblockdist1.3
          newcommandedgedist1.5

          newcommandetape[2]node (p#1) [etape]
          #2

          newcommandtransreceptor[3]%
          path [linepart] (#1.east) -- node [above]
          scriptsize #2 (#3);

          begindocument
          begintikzpicture[scale=0.7,transform shape]

          % Draw diagram elements
          path etape1textbfOperating Items;
          path (p1.west)+(-6.5,0.0)etape2textbfNon-Operating Items;
          path (p2.south)+(1,-1.0)etape3textbfInterest;
          path (p3.south)+(0.0,-1.0)etape4textbfProfits and Losses;
          path (p4.south)+(0.0,-1.0)etape5textbfSubsidies;
          path (p1.south)+(2.5,-1.0)etape6textbfDirect Operating Costs;
          path (p1.south)+(-2.5,-1.0)etape7textbfIndirect Operating Costs;




          % Draw arrows between elements
          foreach X in 3,4,5
          - (pX.west);
          path [line] (p1.south) -- +(0.0,-0.2) -- +(+2.5,-0.2)
          -- node [above, midway] (p6);
          path [line] (p1.south) -- +(0.0,-0.2) -- +(-2.5,-0.2)
          -- node [above, midway] (p7);


          endtikzpicture
          enddocument


          enter image description here



          If you are asking about a cleaner code that achieves this output, the answer will be quite different. E.g. the following is already shorter and simpler IMHO.



          documentclass[tikz,border=10pt]standalone
          usetikzlibraryarrows,positioning

          % Define block styles
          tikzsetmateria/.style=draw, text width=6.0em, text centered,
          minimum height=1.5em,
          etape/.style=materia, text width=12em, minimum width=10em,
          minimum height=3em, rounded corners,
          line/.style=draw, thick, color=black!30, -latex'


          begindocument
          begintikzpicture[scale=0.7,transform shape]
          beginscope[nodes=etape,font=bfseries]
          node (p1) Operating Items;
          node[left=6.5cm of p1] (p2) Non-Operating Items;
          node[below=5mm of p2,xshift=8mm] (p3) Interest;
          node[below=5mm of p3] (p4) Profits and Losses;
          node[below=5mm of p4] (p5) Subsidies;
          node[below left=8mm and 1mm of p1.south] (p6) Direct Operating Costs;
          node[below right=8mm and 1mm of p1.south] (p7) Indirect Operating Costs;
          endscope
          % Draw arrows between elements
          foreach X in 3,4,5
          - (pX.west);
          foreach X in 6,7
          path [line] (p1.south) -- ++(0,-2mm) -
          endtikzpicture
          enddocument





          share|improve this answer















          Welcome to TeX-SE! If your question is about a minimal damage modification of your code that produces something of that sort, here is a proposal:



          documentclass[tikz,border=10pt]standalone
          usetikzlibraryshadows,arrows,positioning
          usepackagecolor,soul %For highlighting
          % Define the layers to draw the diagram
          pgfdeclarelayerbackground
          pgfdeclarelayerforeground
          pgfsetlayersbackground,main,foreground

          % Define block styles
          tikzsetmateria/.style=draw, text width=6.0em, text centered,
          minimum height=1.5em,
          etape/.style=materia, text width=12em, minimum width=10em,
          minimum height=3em, rounded corners,
          texto/.style=above, text width=6em, text centered,
          linepart/.style=draw, thick, color=black!30, -latex', dashed,
          line/.style=draw, thick, color=black!30, -latex',
          ur/.style=draw, text centered, minimum height=0.01em

          % Define distances for bordering
          newcommandblockdist1.3
          newcommandedgedist1.5

          newcommandetape[2]node (p#1) [etape]
          #2

          newcommandtransreceptor[3]%
          path [linepart] (#1.east) -- node [above]
          scriptsize #2 (#3);

          begindocument
          begintikzpicture[scale=0.7,transform shape]

          % Draw diagram elements
          path etape1textbfOperating Items;
          path (p1.west)+(-6.5,0.0)etape2textbfNon-Operating Items;
          path (p2.south)+(1,-1.0)etape3textbfInterest;
          path (p3.south)+(0.0,-1.0)etape4textbfProfits and Losses;
          path (p4.south)+(0.0,-1.0)etape5textbfSubsidies;
          path (p1.south)+(2.5,-1.0)etape6textbfDirect Operating Costs;
          path (p1.south)+(-2.5,-1.0)etape7textbfIndirect Operating Costs;




          % Draw arrows between elements
          foreach X in 3,4,5
          - (pX.west);
          path [line] (p1.south) -- +(0.0,-0.2) -- +(+2.5,-0.2)
          -- node [above, midway] (p6);
          path [line] (p1.south) -- +(0.0,-0.2) -- +(-2.5,-0.2)
          -- node [above, midway] (p7);


          endtikzpicture
          enddocument


          enter image description here



          If you are asking about a cleaner code that achieves this output, the answer will be quite different. E.g. the following is already shorter and simpler IMHO.



          documentclass[tikz,border=10pt]standalone
          usetikzlibraryarrows,positioning

          % Define block styles
          tikzsetmateria/.style=draw, text width=6.0em, text centered,
          minimum height=1.5em,
          etape/.style=materia, text width=12em, minimum width=10em,
          minimum height=3em, rounded corners,
          line/.style=draw, thick, color=black!30, -latex'


          begindocument
          begintikzpicture[scale=0.7,transform shape]
          beginscope[nodes=etape,font=bfseries]
          node (p1) Operating Items;
          node[left=6.5cm of p1] (p2) Non-Operating Items;
          node[below=5mm of p2,xshift=8mm] (p3) Interest;
          node[below=5mm of p3] (p4) Profits and Losses;
          node[below=5mm of p4] (p5) Subsidies;
          node[below left=8mm and 1mm of p1.south] (p6) Direct Operating Costs;
          node[below right=8mm and 1mm of p1.south] (p7) Indirect Operating Costs;
          endscope
          % Draw arrows between elements
          foreach X in 3,4,5
          - (pX.west);
          foreach X in 6,7
          path [line] (p1.south) -- ++(0,-2mm) -
          endtikzpicture
          enddocument






          share|improve this answer














          share|improve this answer



          share|improve this answer








          edited Apr 7 at 18:43

























          answered Apr 7 at 18:30









          marmotmarmot

          117k6150283




          117k6150283












          • That was exactly what I was searching for

            – L Lewis
            Apr 7 at 18:36

















          • That was exactly what I was searching for

            – L Lewis
            Apr 7 at 18:36
















          That was exactly what I was searching for

          – L Lewis
          Apr 7 at 18:36





          That was exactly what I was searching for

          – L Lewis
          Apr 7 at 18:36










          L Lewis is a new contributor. Be nice, and check out our Code of Conduct.









          draft saved

          draft discarded


















          L Lewis is a new contributor. Be nice, and check out our Code of Conduct.












          L Lewis is a new contributor. Be nice, and check out our Code of Conduct.











          L Lewis is a new contributor. Be nice, and check out our Code of Conduct.














          Thanks for contributing an answer to TeX - LaTeX Stack Exchange!


          • Please be sure to answer the question. Provide details and share your research!

          But avoid …


          • Asking for help, clarification, or responding to other answers.

          • Making statements based on opinion; back them up with references or personal experience.

          To learn more, see our tips on writing great answers.




          draft saved


          draft discarded














          StackExchange.ready(
          function ()
          StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2ftex.stackexchange.com%2fquestions%2f483701%2fwork-breakdown-with-tikz%23new-answer', 'question_page');

          );

          Post as a guest















          Required, but never shown





















































          Required, but never shown














          Required, but never shown












          Required, but never shown







          Required, but never shown

































          Required, but never shown














          Required, but never shown












          Required, but never shown







          Required, but never shown







          Popular posts from this blog

          Export of reprojected layer from GEE fails Planned maintenance scheduled April 17/18, 2019 at 00:00UTC (8:00pm US/Eastern) Announcing the arrival of Valued Associate #679: Cesar Manara Unicorn Meta Zoo #1: Why another podcast?Iterate over features and years to export images for each feature-yearEarth engine reproject: why does reprojecting a pixel at 30m scale gives me pixels with an area of ~550?Exporting slope raster for entire country in GEEGEE Landsat SR year composite // mask cloud / shadow out w/ other method than quality pixel"export region contains no valid (un-masked) pixels - Google Earth EgineGoogle Earth Engine, how to distinguish between rivers/streams and ponds/lakes in a water maskPython script tool fails when processing rainfall data from Google Earth EngineGoogle Earth Engine Error: Number of pixels requested from Image.load exceeds the maximum allowedCloudfree images in small area from Sentinel-2Using Image exportToDrive in Google Earth Engine?

          Magento 1.9 observer on only new product added ( no updated product )Admin Create New Order ObserverObserver checkout_cart_product_add_after get product quantity in cartHow can I differentiate between product creation and saving existing products?How to get the original price Product SaveBeforeMagento Observer for Admin Sales order Address updateHow do i get quantity in a product_save_after event observer magento2?Using observer event to get updated customer infoSave product observer - detect availabilityEvent not triggered when new product added in admin : Magento 2magento 1.9 observer on quantity product change

          Crop image to path created in TikZ? Announcing the arrival of Valued Associate #679: Cesar Manara Planned maintenance scheduled April 17/18, 2019 at 00:00UTC (8:00pm US/Eastern)Crop an inserted image?TikZ pictures does not appear in posterImage behind and beyond crop marks?Tikz picture as large as possible on A4 PageTransparency vs image compression dilemmaHow to crop background from image automatically?Image does not cropTikzexternal capturing crop marks when externalizing pgfplots?How to include image path that contains a dollar signCrop image with left size given